On this page +
Every legitimate electrical panel replacement or 200-amp service upgrade in Greater Austin requires two separate approvals: a municipal electrical permit & inspection from your city (Austin DSD/AB+C, Round Rock, Cedar Park, Lakeway, West Lake Hills, etc.) and a coordinated meter disconnect/reconnect with your electric utility (Austin Energy, Oncor, Pedernales Electric Cooperative [PEC], or Georgetown Electric). Under Texas TDLR law, only a licensed Texas Electrical Contractor (TECL) with a Master Electrician of Record can pull these commercial/residential contractor permits — and DC Electric handles every filing, utility spot request, and inspector sign-off turnkey so your power is restored the same day.
Need a licensed Austin electrician? Explore our Austin Panel Upgrades service, permits & upfront pricing →
The hidden reason Greater Austin panel upgrades confuse national contractors: two overlapping maps
In most U.S. metro areas, one city building department talks to one electric utility. Greater Austin doesn’t work like that at all. Across Travis and Williamson counties, your municipal permit office and your electric utility follow two completely separate boundary maps.
You can live inside West Lake Hills — pulling your electrical permit from the City of West Lake Hills — while your meter pole belongs to Austin Energy. Ten minutes west in Lakeway, one neighborhood street sits on Austin Energy while the next cul-de-sac belongs to Pedernales Electric Cooperative (PEC), both inspected by the City of Lakeway. Drive north into Cedar Park or Round Rock, and streets divide between PEC and Oncor!
Installing the wrong meter socket for your specific utility — even if it’s a brand-new UL-listed box from a supply house — gets an immediate red tag from the utility lineman on upgrade afternoon, leaving your house dark. That’s why knowing the local rulebook before upgrade morning matters just as much as the copper inside the panel.
You never have to call the city permit desk or sit on hold with Austin Energy, Oncor, or PEC. DC Electric handles every permit, load calculation, meter-socket spec, and same-day utility reconnect turnkey under TECL #38552.
Looking for exact equipment and labor price ranges alongside permit rules? Read our companion 200-amp panel upgrade cost guide for Austin or explore our Austin panel upgrade service.
Side-by-Side: Austin Energy vs. Oncor vs. PEC Service Upgrade Rules (2026)
| Requirement | Austin Energy | Oncor Electric Delivery | Pedernales Electric Co-op (PEC) |
|---|---|---|---|
| Primary Cities Served | Austin, West Lake Hills, Rollingwood, Sunset Valley, parts of Lakeway & Manor | Round Rock, Pflugerville, Hutto, eastern Georgetown & parts of Cedar Park | Cedar Park, Leander, Lakeway, Bee Cave, Dripping Springs, Liberty Hill |
| Design Manual | Austin Energy Design Criteria (strictly enforced) | Oncor Electric Service Guidelines | PEC Electric Service Standards & Specs |
| Meter Socket Rule | Must match AE-approved meter can list & jaw clamping specs | Specific Oncor-approved ringless / lever-bypass cans by class | PEC-approved meter loop, hub & clearance specs |
| Permit Portal | City of Austin AB+C (or enclave city building dept.) | Local city portal (e.g., Round Rock CSS, Pflugerville) | Local city portal (Cedar Park, Leander, Lakeway) or county compliance |
| Typical Outage Window | Same-day disconnect/reconnect (~5–8 hrs) | Same-day scheduled disconnect/reconnect (~5–8 hrs) | Same-day scheduled crew coordination (~5–8 hrs) |
The 5 Code & Utility Rules That Shape Your 2026 Panel Upgrade
Older 1960s and 1970s Austin homes frequently have their original 100-amp meter mounted seven feet up a brick wall, tucked right above a Texas Gas Service regulator, or sitting inside a screened-in back porch that a previous owner enclosed in 1988. When you step up from 100A to 200A (or perform a full Federal Pacific or Zinsco panel replacement that requires a new meter can), utilities enforce modern centerline meter height (typically 4 to 6 feet above finished grade) and minimum radial clearance (usually 3 feet) from natural gas meters and operable windows. Checking those tape-measure clearances during our first visit prevents surprise masonry relocations on install day.
Under modern NEC editions enforced across Austin, Round Rock, Cedar Park, and surrounding municipalities, service upgrades require two critical safety additions:
- An exterior emergency main disconnect clearly labeled so firefighters can cut power to the structure from outside in seconds without entering a smoke-filled garage or hallway.
- Type 1 or Type 2 surge protection at the service equipment — protecting sensitive inverter HVAC systems, induction ranges, and smart appliances (see our whole-house surge protection service).
Inspectors never sign off on a 200-amp upgrade connected to a single rusty 1972 ground clamp. Every permitted service upgrade we perform includes two newly driven 8-foot copper-clad ground rods spaced at least 6 feet apart, continuous copper grounding electrode conductor routing, main cold-water bond verification, and an exterior Intersystem Bonding Termination (IBT) bridge for low-voltage fiber/cable grounding.
Many mid-century homes in Hyde Park, Allandale, Crestview, and older Georgetown still have their breaker box inside a master bedroom clothes closet or narrow laundry alcove. NEC 240.24(D) strictly bans overcurrent devices near easily ignitable clothing, and NEC 110.26 requires a clear 30-inch-wide by 36-inch-deep working space in front of the panel. When relocating an illegal closet panel, we convert the old recessed cabinet into a neat, flush-covered junction box and mount the new 200A copper-bus panel on the exterior wall or garage — passing both municipal inspection and future buyer home inspection electrical repair checklists.
If you’re upgrading your panel to add a Level 2 EV charger, a 50-amp generator interlock & exterior inlet, or a SPAN Smart Panel, pulling everything under one coordinated electrical permit saves a duplicate municipal filing fee, a second inspector visit, and guarantees your closed permit paperwork matches utility rebate audits (see our 2026 Austin panel & EV rebates guide).
TDLR Licensing, Passed Stickers & Our 10-Year Panel Warranty
In Texas, electrical contracting is regulated statewide by the Texas Department of Licensing and Regulation (TDLR). DC Electric, Inc. (TECL #38552) manages all municipal permitting, NEC Article 220 load calculations, utility coordination, and licensed residential field installations across Greater Austin.
When we finish your upgrade, you don’t just get a clean copper-bus panel with laser-printed circuit labels — you get the official city permit number, the passed municipal inspection record for your homeowners insurance and future buyers, our 10-year workmanship warranty on all electrical panel work (plus our 5-year workmanship warranty on all general electrical work).
Planning a 200-amp service upgrade, hazard panel swap, or smart panel anywhere in Austin Energy, Oncor, or PEC territory? Call (512) 954-4782 or book online 24/7 for an upfront flat-rate evaluation (with 24/7 phone & online booking for everyone, and 24/7 emergency service for existing customers).
If you're in doubt, call DC Electric out.
Whatever the electrical question, a Lead Technician comes out, does a thorough check, and gives you a clear course of action with a guaranteed repair or fix — and an upfront flat-rate price before any work begins.
How a permitted same-day panel upgrade works from start to finish
- Step 1: On-site NEC Article 220 load calculation & meter-loop check. We verify your existing service entrance wire gauge, overhead mast vs. underground conduit, meter height, and working clearances against both city code and your specific utility's design manual.
- Step 2: Municipal permit filing & utility service spot request. Our office files the electrical permit under TECL #38552 and requests a meter spot / scheduled disconnect window with Austin Energy, Oncor, PEC, or Georgetown Electric.
- Step 3: Scheduled morning disconnect (typically 8:00–9:30 AM). Power comes down safely at the meter or transformer so our licensed crew can rebuild your panel, meter base, grounding electrodes, and surge protection cleanly.
- Step 4: Same-day copper-bus installation, torqueing & circuit directory. We install your new 200A panel (or SPAN Smart Panel), drive dual copper-clad ground rods, add Type 2 surge protection, and label every breaker clearly by room.
- Step 5: Inspection release, same-day reconnect & 10-year warranty packet. Power is restored before evening, final municipal inspection is closed out on public record, and you receive your permit record and 10-year panel workmanship warranty.
- Cutting an Austin Energy, Oncor, or PEC meter tag without authorization triggers utility tampering fees and can result in immediate red-tag disconnection until an emergency permit clears
- Unpermitted panel or EV circuits automatically disqualify you from Austin Energy's up-to-$1,200 EV charger and solar/battery rebate programs
- Texas homeowners insurance carriers routinely reject unpermitted Federal Pacific (FPE) or Zinsco panel replacements during underwriting audits
- At resale, buyer inspectors check city permit portals when they see a brand-new panel on a 1970s house — forcing retroactive permitting before closing
We believe your home should have safe, reliable electrical wiring to protect your family's well-being.
Common questions
Who is legally allowed to pull an electrical panel upgrade permit in Austin and surrounding cities?
Will my house be left without electricity overnight waiting on a city inspector?
How do Austin Energy, Oncor, and PEC meter requirements differ?
What 2026 NEC code upgrades are triggered when I replace my breaker panel?
Do enclave cities like West Lake Hills, Lakeway, Round Rock, and Cedar Park use Austin Energy permits?
When can a SPAN Smart Panel save weeks of utility transformer permitting?
Standing By to Take Your Call
Book online any time, or give us a call and we'll get you scheduled — existing customers reach us 24/7.