On this page +
In Greater Austin, replacing an existing 200-amp breaker box (like-for-like) typically runs $2,800–$4,800, while a full 100-amp or 150-amp to 200-amp service upgrade — including a new meter base, service entrance conductors, grounding system, city permit, and utility disconnect/reconnect — generally lands between $4,500 and $8,500+. If underground trenching, stucco/masonry repair, or a smart panel like SPAN is involved, totals can reach $8,500–$14,000+. Below is the exact breakdown across Austin Energy, Oncor, PEC, and Georgetown utilities.
Why two “200-amp panel quotes” in Austin can be $4,000 apart
Homeowners call us every week asking for a ballpark price on a 200-amp panel upgrade, and the biggest source of confusion is that two completely different jobs get called a “panel upgrade.”
- A Panel Replacement (Like-for-Like Amperage): Your home already has a 200-amp meter base and 200-amp service entrance conductors from the utility, but the breaker box itself is full, corroded, storm-damaged, or a recalled brand (Federal Pacific or Zinsco). Replacing the breaker panel and breakers while keeping the 200A service rating typically runs $2,800–$4,800.
- A Full Service Upgrade (100A / 125A / 150A → 200A): Your home only receives 100, 125, or 150 amps from the utility. Stepping up to 200 amps means replacing the breaker panel, the exterior meter base, the service entrance cables/riser, and the grounding electrode system (dual ground rods, water bond, and intersystem bonding bridge), plus coordinating a live disconnect/reconnect with your utility and city inspector. That complete project typically runs $4,500–$8,500+.
Your existing service amperage and overhead vs. underground utility feed determine the scope. Replacing an existing 200A box is half the work of rebuilding an older 100A service from the meter base to the ground rods.
2026 Electrical Panel Upgrade Cost Table (Greater Austin)
Here is where real, permitted residential projects land across Central Texas in 2026:
| Project Type | What’s Included | Typical Austin Metro Range |
|---|---|---|
| 200A Panel Swap (Like-for-Like) | New 200A copper-bus panel, new AFCI/GFCI/standard breakers, whole-home surge protector, grounding check, permit & inspection | $2,800–$4,800 |
| 100A/150A → 200A Overhead Upgrade | New 200A panel, new meter base, new overhead service mast/weatherhead, NEC grounding upgrade, utility disconnect/reconnect, permit | $4,500–$7,500 |
| 100A/150A → 200A Underground Upgrade | New 200A panel, new meter base, underground riser/lateral verification (excluding long trenching), grounding, utility & city inspection | $5,200–$8,500+ |
| Recalled Panel Replacement (FPE / Zinsco) | Removal of hazardous Federal Pacific Stab-Lok or Zinsco equipment, full breaker replacement, service & grounding update | $3,500–$7,800 |
| SPAN Smart Panel Upgrade | SPAN Smart Panel hardware + turnkey installation, circuit commissioning, load-management setup, permit | $7,500–$12,500+ |
| 320A / 400A Heavy Service Upgrade | Dual 200A panels, 320A/400A meter base, CT cabinet or dual risers, engineered load study for large estates | $9,000–$16,000+ |
The 6 Factors That Move Your Quote in Central Texas
Greater Austin isn’t served by a single electric utility, and each provider enforces its own meter socket specifications, disconnect scheduling, and inspection release rules:
- Austin Energy (Austin & West Lake Hills): Requires strict Austin Energy Design Criteria compliance, approved meter cans, and city inspection release before final tag.
- Oncor (Round Rock, Pflugerville, parts of Georgetown & Cedar Park): Uses Oncor-approved lever-bypass or ringless meter bases depending on the service class and requires coordinated outage windows.
- Pedernales Electric Cooperative — PEC (Leander, Cedar Park, Dripping Springs): Has specific PEC meter loop and clearance standards, particularly on acreage and Hill Country lots.
- City of Georgetown Electric (Georgetown & Sun City): Coordinates municipal electric inspection directly alongside city utility crews.
Older homes in Central Austin, Round Rock West, and central Georgetown often have overhead service drops where the wire comes from a pole to a roof mast. Upgrading an overhead mast is straightforward for our crew. By contrast, 1980s–2000s subdivisions in Cedar Park, Leander, and West Lake Hills frequently have underground utility feeds. If the underground conduit or utility conductor is only rated for 125A or 150A, we either verify utility lateral capacity or use an NEC-approved load management solution.
Under current NEC adoption across Austin and surrounding municipalities, panel upgrades require Type 1 or Type 2 whole-home surge protection at the service entrance and appropriate AFCI/GFCI breaker protection where circuits are modified or extended. A whole-house surge protector installed during your panel upgrade protects your HVAC boards, refrigerator, and EV charger from Central Texas lightning and grid switching spikes.
If your home still has a Federal Pacific Stab-Lok or Zinsco panel, or an early 1980s Challenger/split-bus box, home inspectors and insurance underwriters in Texas routinely flag them Before binding coverage or closing a sale. Replacing them removes a documented fire risk and brings your bus bar and breakers onto modern copper-bus equipment backed by our 10-year warranty on panel upgrades.
Current code prohibits electrical panels inside clothes closets, bathrooms, or tight clearances without a 30-inch-wide by 36-inch-deep working space. If an older home has a panel tucked inside a hallway linen closet, relocating the new panel to an exterior wall or garage wall turning the old box into a junction point adds labor and drywall/masonry work.
Many panel upgrades are triggered by a new Level 2 EV charger installation. If you upgrade your panel at the same time we run your 240V EV circuit, you save a second permit fee and a second mobilization. And if your home has a 200A underground feed that can’t easily be trenched to 400A, installing a SPAN Smart Panel lets you run high-powered EV charging and whole-home backup without trenching the yard.
Local Permitting & Service Areas Across the Austin Metro
We handle the entire permit, NEC load calculation, utility disconnect, and municipal inspection process in-house across every city we serve:
- Austin Panel Upgrades: 100A-to-200A service upgrades in Hyde Park, Tarrytown, Crestview, Allandale, Zilker, Travis Heights, and South Austin.
- Round Rock Panel Upgrades: Replacing 1970s–1990s builder panels in Round Rock West, Chisholm Valley, Brushy Creek, Teravista, and Forest Creek.
- Cedar Park Panel Upgrades: 200A upgrades and surge-hardened replacements in Buttercup Creek, Twin Creeks, Anderson Mill West, Cypress Mill, and Ranch at Brushy Creek.
- Georgetown Panel Upgrades: Historic Old Town service upgrades, Sun City capacity expansions, Berry Creek, and Wolf Ranch.
- Leander Panel Upgrades: Upgrading overloaded 150A builder panels in Crystal Falls, Mason Creek, Block House Creek, Travisso, and Bryson.
- West Lake Hills Panel Upgrades: Heavy 200A, 320A, and 400A estate service upgrades and SPAN Smart Panel installations in Westlake, Rollingwood, Davenport Ranch, and Barton Creek.
Get a Flat-Rate, Written Quote Before Any Work Begins
Every home’s meter loop, grounding path, and breaker schedule is slightly different. When DC Electric comes out to inspect your panel, we run a real NEC load calculation, check your utility feed and meter base, and give you a flat-rate, written quote with every permit and utility step included — backed by our 10-year panel upgrade warranty.
Call (512) 954-4782 or book online to schedule your panel evaluation anywhere in Greater Austin.
If you're in doubt, call DC Electric out.
Whatever the electrical question, a Lead Technician comes out, does a thorough check, and gives you a clear course of action with a guaranteed repair or fix — and an upfront flat-rate price before any work begins.
How to plan a 200-amp panel upgrade in Greater Austin
- Check your main breaker and meter base first. Look at the number stamped on your main breaker handle (100, 125, 150, or 200) and note whether your panel brand is Federal Pacific, Zinsco, Challenger, or an aging builder-grade box.
- List the 240V loads you plan to add in the next 3–5 years. Level 2 EV chargers, variable-speed HVAC systems, induction ranges, pool equipment, and battery storage all affect your NEC load calculation.
- Identify your electric utility provider. Austin Energy, Oncor (Round Rock, Georgetown corridor, Pflugerville), Pedernales Electric Cooperative (Cedar Park, Leander), and City of Georgetown Electric each have distinct meter spot and disconnect rules.
- Bundle EV charger or surge protection work into the same visit. Adding a whole-home surge protector or Level 2 EV circuit while the panel is open saves duplicate permit fees and labor.
We believe your home should have safe, reliable electrical wiring to protect your family's well-being.
Common questions
How much does a 200-amp panel upgrade cost in Austin in 2026?
How long is power off during a panel replacement?
Do I need a city permit and utility coordination for a panel upgrade?
Why does an underground service upgrade cost more than an overhead mast?
Should I upgrade to a standard 200A panel or a SPAN Smart Panel?